Job description
|
The scope of work consists in the engineering, supply, installation, commissioning and handover
of the following process units and facilities to the owner of the plant:
- Unit for Feed Gas compression
- Unit for
Condensate stabilisation
- Units for Rich Gas Acid Gas Removal
- Units for Lean Gas Acid Gas Removal
- Units for Rich Gas Dehydration, Mercury Removal and NGL Recovery
- Units forLean Gas Dehydration, Mercury
Removal and NGL Recovery
- Units for Sulphur Recovery and Tail Gas Treating
Units
- Unit for Fuel
Gas system
- Unit for Acid,
Cold and hydrocarbon Flares
- Unit for Sour Water Stripper
Scope shall include the following:
- Process
equipment, and piping within the Process units up to Utilities battery limits.
- All piperacks within Unit limits and
within Process EPC up to Utilities units battery limits
- All foundations and steelwork within
Process plant EPC package area
- All undergrounds within Process plant
EPC package area
- All roads within Process Plant EPC package area
- All fencing within Process Plant EPC package area
- All buildings within
Process Plant Units only including sub-stations, switchrooms, IES’s, equipment
shelters, operator facilities, satellite workshops etc
- Utilities within Process plant EPC
package area
- Electrical
scope includes Main Sub-station and any downstream electrical equipment
including bulks will be supplied and installed
- Instrumentation
scope includes IES and any downstream instrumentation / equipment including
bulks shall be supplied and installed
|