For a 850MW coal fired power plant, we are seeking several experienced WSC and BOP
commissioning engineers.
The commissioning
activity starts with the hand over from erection, when the installation
of the
equipment, hydrostatic tests and system cleaning and flushing, loop
checks
(cabling point to point) and Electrical insulation tests are already
done.
WSC and BOP commissioning engineers
Work location
Poland
Type of work
6 to 9 Months
Start date
asap
Job description
The tasks of the Water Steam Cycle (WSC) and Balance of Plant (BOP) Commissioning engineers
cold
commissioning:
Verify installation according
P&ID
Signal check from field to DCS
Function check of equipment
(rotation check,…)
Adjustment of equipment
(switches, valves, transmitters,…)